Guidance Notes to Complete the Testing and Exercising Template
Jump to navigation
Jump to search


Guidance Notes to Complete the Testing and Exercising Template
Testing and Exercising Considerations
- The sample plan provides examples of how to write a complete testing plan for the business continuity plan.
- Testing & Exercising should be conducted during peak and non-peak periods. This includes both unannounced and announced tests.
- The plan should follow a logical and gradual progression of test stage, also known as BC Testing Cycle. This includes testing from the minor components to the full simulation.
- These procedures should include methods for maintaining and updating the plan.
- Some sections of the sample plan are written as examples that the organization can use in a plan, others are instructional.
- The instructional sections provide information that should be considered when writing the specific segment.
- This template provides only a sample of a complete business continuity plan.
Content of Testing and Exercising
- Design Profile (Master)
- Design Profile for Notification Test (Sample)
- Design Profile for Walkthrough Test (Sample)
- Overall Test Schedule for Organization (Sample)