Difference between revisions of "BCP Scenarios and assumptions v2"
Jump to navigation
Jump to search
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | {{Template:Planning Methodology PD}} {{Button Back BCM PD | + | {{Template:Planning Methodology PD}} {{Button Back BCM PD}} |
= <span style="color:#0000FF">'''Scenarios and Assumptions''' = | = <span style="color:#0000FF">'''Scenarios and Assumptions''' = | ||
[[File:Plan Develop Template Part A 1.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]] | [[File:Plan Develop Template Part A 1.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]] | ||
− | |||
− | Business disruptions to Organization’s [[Critical Business Functions (CBF)| Critical Business Functions]] can arise from the following scenarios: | + | == '''Disaster Scenario''' == |
− | * Utility outage (including power). | + | |
− | * Damage or denial of access to the Office Building (including fire and building collapse). | + | * Business disruptions to Organization’s [[Critical Business Functions (CBF)| Critical Business Functions]] can arise from the following scenarios: |
+ | ** Utility outage (including power). | ||
+ | ** Damage or denial of access to the Office Building (including fire and building collapse). | ||
== '''Key Assumptions''' == | == '''Key Assumptions''' == | ||
− | BC Planning in ABC Organization is based on the following key assumptions: | + | {{WSQ BCM Course Catalog}} |
− | * The main office (Name of Building) building is down, and the offsite data | + | * BC Planning in ABC Organization is based on the following key assumptions: |
− | * Staff is denied access to the (Name of Building) building for a sustained period of X calendar days. Refer to [[Key Disaster Scenario]] | + | ** The main office (Name of Building) building is down, and the offsite data centre/ office at Building Name, ABC Road is available. |
− | * Only critical business functions will be accorded priority for [[restore| restoration]]. | + | ** Staff is denied access to the (Name of Building) building for a sustained period of X calendar days. Refer to [[Key Disaster Scenario]] |
− | * Should the [[crisis]] be projected to exceed seven (7) days, extended planning will commence after day 2 or 3. | + | ** Only critical business functions will be accorded priority for [[restore| restoration]]. |
− | + | ** Should the [[crisis]] be projected to exceed seven (7) days, extended planning will commence after day 2 or 3. | |
{{Button Back BCM TOC}} | {{Button Back BCM TOC}} |
Latest revision as of 06:06, 22 June 2021
Scenarios and Assumptions
Disaster Scenario
- Business disruptions to Organization’s Critical Business Functions can arise from the following scenarios:
- Utility outage (including power).
- Damage or denial of access to the Office Building (including fire and building collapse).
Key Assumptions
- BC Planning in ABC Organization is based on the following key assumptions:
- The main office (Name of Building) building is down, and the offsite data centre/ office at Building Name, ABC Road is available.
- Staff is denied access to the (Name of Building) building for a sustained period of X calendar days. Refer to Key Disaster Scenario
- Only critical business functions will be accorded priority for restoration.
- Should the crisis be projected to exceed seven (7) days, extended planning will commence after day 2 or 3.