Difference between revisions of "Guidance Notes-IT Recovery Strategy"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | {{Button Back DR BCS}} | ||
{{BCM Series Recovery Strategy}} | {{BCM Series Recovery Strategy}} | ||
[[Image:BCM Planning Methodology RS.jpg|right|200px|BCM Planning Methodology:Business Continuity Strategy]] | [[Image:BCM Planning Methodology RS.jpg|right|200px|BCM Planning Methodology:Business Continuity Strategy]] | ||
Line 16: | Line 17: | ||
** Transfer the function number as specified in the [[Business Impact Analysis (BIA)]] Questionnaire (BIAQ) | ** Transfer the function number as specified in the [[Business Impact Analysis (BIA)]] Questionnaire (BIAQ) | ||
** Transfer the name of the function as highlighted in the [[Business Impact Analysis (BIA)]] Questionnaire (BIAQ) | ** Transfer the name of the function as highlighted in the [[Business Impact Analysis (BIA)]] Questionnaire (BIAQ) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Content of IT DR Strategy Questionnaires == | == Content of IT DR Strategy Questionnaires == | ||
Line 30: | Line 24: | ||
* [[Part_2:_Recovery_Strategies_DR|Part 2: Recovery Strategies]] | * [[Part_2:_Recovery_Strategies_DR|Part 2: Recovery Strategies]] | ||
* [[Part_3:_Minimum_Resources_Required_DR|Part 3: Minimum Resources Required]] | * [[Part_3:_Minimum_Resources_Required_DR|Part 3: Minimum Resources Required]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Revision as of 15:43, 30 January 2021
Think of Business Continuity Strategy as:
- A conceptual summary of recovery processes that must be carried out between the occurrence of a disaster and the time when normal operations are restored.
- An alternate processing or interim ability to process data and continue providing critical service while a full recovery of the primary site is underway.
Guidance Notes to Complete the Business Continuity Strategy Template
This is the template for documenting the Business Continuity Strategy for individual business units.
- Name of Business Unit (BU)
- Input the complete name of the business unit and its acronym.
- Critical Business Function
- Transfer the function number as specified in the Business Impact Analysis (BIA) Questionnaire (BIAQ)
- Transfer the name of the function as highlighted in the Business Impact Analysis (BIA) Questionnaire (BIAQ)
Content of IT DR Strategy Questionnaires
- Part 0: Cover Sheet
- Part 1: Mitigation Strategies
- Part 2: Recovery Strategies
- Part 3: Minimum Resources Required
Useful Link on related terms: BCMBoK 4: Business Continuity Strategy