Difference between revisions of "Test - Structured Walkthrough"

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Jump to navigation Jump to search
Line 2: Line 2:
 
|'''1.''' In Structured Walkthrough Test, the team member walkthrough the plan to identify and correct weaknesses.  
 
|'''1.''' In Structured Walkthrough Test, the team member walkthrough the plan to identify and correct weaknesses.  
 
{{Template:BL-DR-5Banner}}  
 
{{Template:BL-DR-5Banner}}  
 +
  
 
'''Related Terms''': [[Test - Tabletop |Tabletop Test]], [[Test - Disaster Recovery Plan Test Cycle| Type of DR Plan Tests]], [[Test - Walkthrough|Walkthrough Test]].
 
'''Related Terms''': [[Test - Tabletop |Tabletop Test]], [[Test - Disaster Recovery Plan Test Cycle| Type of DR Plan Tests]], [[Test - Walkthrough|Walkthrough Test]].
  
'''Note:''' For example, a structured walkthrough [[test]] of a recovery plan involves representatives from each of the functional areas coming together to review the plan to determine if the plan pertaining to their area is accurate and complete and can be implemented when required.
+
'''Notes:''' For example, a structured walkthrough [[test]] of a recovery plan involves representatives from each of the functional areas coming together to review the plan to determine if the plan pertaining to their area is accurate and complete and can be implemented when required.
 
+
{{Template:DR Course}}
 
{{BcmBoK 6 CL 2B}}
 
{{BcmBoK 6 CL 2B}}
 
<br><br>
 
<br><br>

Revision as of 05:54, 30 October 2020

1. In Structured Walkthrough Test, the team member walkthrough the plan to identify and correct weaknesses.


Related Terms: Tabletop Test, Type of DR Plan Tests, Walkthrough Test.

Notes: For example, a structured walkthrough test of a recovery plan involves representatives from each of the functional areas coming together to review the plan to determine if the plan pertaining to their area is accurate and complete and can be implemented when required.

BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2B: Intermediate (BC)



BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2C: Intermediate (CM)



BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2CC: Intermediate (CC)



BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2D: Intermediate (DR)

(Source: Business Continuity Management Institute - BCM Institute)