Part B Corporate Level Procedures

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Revision as of 21:38, 23 May 2010 by Moh heng (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back >> Table of Content

  • Part B of this plan sets out the sequential procedures to be undertaken upon activation for the entire organization.
    • In the event of a disaster, each BU Coordinator is to refer to Part B and follow through with the procedures that he or she is responsible for.