From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
1. Coming soon.
2. An evaluation of the future net cashflows generated by a capital project by discounting them to their present-day value. The two methods most commonly used are:
- Yield method, for which the calculation determines the internal rate of return (IRR) in the form of a percentage;
- Net Present Value (NPV) method, in which the discount rate is chosen and the answer is a sum of money.
(Source: OGC, Information Technology Infrastructure Library (ITIL) v3)
|