Difference between revisions of "Guidance Notes-PD-v2"

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Jump to navigation Jump to search
Line 9: Line 9:
 
*The instructional sections provide information that should be considered when writing the specific segment.
 
*The instructional sections provide information that should be considered when writing the specific segment.
 
*This template provides only a sample of a complete business continuity plan.   
 
*This template provides only a sample of a complete business continuity plan.   
*[[Writing Tips]]
+
* [[PD_Writing Tips_v2| Writing Tips]]
*[[Useful Verbs]]
+
* [[PD_Useful Verbs_v2| Useful Verbs]]
  
 
[[Plan Development| '''Back >> Plan Development''']]
 
[[Plan Development| '''Back >> Plan Development''']]
Line 25: Line 25:
 
== Table of Content ==
 
== Table of Content ==
  
*[[Table of Content]]
+
* [[PD_Table_of_Content_v2| Table of Content]]
  
 
== Checklist Prior to Submission (Part C) ==
 
== Checklist Prior to Submission (Part C) ==
  
* [[Checklist Prior to Submission (Part C)| Checklist]]
+
* [[PD_Checklist_v2| Checklist]]
  
 
Useful Link on related terms: [[BCMBoK 5: Plan Development]]
 
Useful Link on related terms: [[BCMBoK 5: Plan Development]]

Revision as of 04:21, 17 January 2020

Implementing Your Business Continuity Plan BUY!
BCM Planning Methodology PD.jpg

Guidance Notes to Complete the Business Continuity Plan Template

Plan Development Considerations

  • The sample plan provides examples of how to write a complete business continuity plan.
  • A plan should be thoroughly developed, addressing procedures to be used before, during and after a disaster.
  • These procedures should include methods for maintaining and updating the plan.
  • The sample plan illustrates the structure and writing styles mentioned above.
  • Some sections of the sample plan are written as examples that the organization can use in a plan, others are instructional.
  • The instructional sections provide information that should be considered when writing the specific segment.
  • This template provides only a sample of a complete business continuity plan.
  • Writing Tips
  • Useful Verbs

Back >> Plan Development

Part 0 Cover


Table of Content

Checklist Prior to Submission (Part C)

Useful Link on related terms: BCMBoK 5: Plan Development