Difference between revisions of "Guidance Notes-PD-v2"

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Jump to navigation Jump to search
Line 18: Line 18:
 
*[[Part_3:_Risk_Assessment_CRA3_v2| Part 3: Crisis Treatment and Control]]
 
*[[Part_3:_Risk_Assessment_CRA3_v2| Part 3: Crisis Treatment and Control]]
  
== '''Part 0 Cover''' ==
+
= '''Part 0 Cover''' =
*Organization Logo (''Insert'')
+
* Organization Logo (''Insert'')
*CONFIDENTIAL
+
* CONFIDENTIAL
*Name of Business Unit (''Change Name'')
+
* Name of Business Unit (''Change Name'')
*[[Business Continuity Plan (BC Plan)| Business Continuity Plan]]
+
* [[Business Continuity Plan (BC Plan)| Business Continuity Plan]]
  
 
== '''Table of Content''' ==
 
== '''Table of Content''' ==

Revision as of 04:12, 27 January 2020

Implementing Your Business Continuity Plan BUY!
BCM Planning Methodology PD.jpg

Guidance Notes to Complete the Business Continuity Plan Template

Plan Development Considerations

  • The sample plan provides examples of how to write a complete business continuity plan.
  • A plan should be thoroughly developed, addressing procedures to be used before, during and after a disaster.
  • These procedures should include methods for maintaining and updating the plan.
  • The sample plan illustrates the structure and writing styles mentioned above.
  • Some sections of the sample plan are written as examples that the organization can use in a plan, others are instructional.
  • The instructional sections provide information that should be considered when writing the specific segment.
  • This template provides only a sample of a complete business continuity plan.
  • Writing Tips
  • Useful Verbs

Content of Business Continuity Plan Template

Part 0 Cover

Table of Content

Checklist Prior to Submission (Part C)

Useful Link on related terms: BCMBoK 5: Plan Development