Difference between revisions of "Test - Tabletop"

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Jump to navigation Jump to search
 
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{| style="margin-left: 0px; text-align: left; font-style: none; width:100%; font-weight: none; background: #F0F0F0; border:1px "
+
{| style="margin-left: 0px; text-align: left; font-style: none; width:100%; font-weight: none; background: #F0F0F0; border:1px"
| '''1.''' Tabletop Test is a test of the recovery plan in which actions are not actually performed.
+
|-
[[Image:BCM Planning Methodology TE.jpg|400px|right|BCM Planning Methodology:Testing and Exercising]]
+
| '''1.''' Tabletop Test is a test of the recovery plan in which actions are not actually performed.  
 +
{{Template:BL-DR-5Banner}}
  
Related Terms: [[Type of Tests| Type of BC Tests]], [[Test - Disaster Recovery Plan Test Cycle| Type of DR Plan Tests]], [[Test - Walkthrough|Walkthrough Test]], [[Test - Structured Walkthrough|Structured Walkthrough Test]].
+
'''Related Terms''': [[Type_of_Tests|Type of BC Tests]], [[Test_-_Disaster_Recovery_Plan_Test_Cycle|Type of DR Plan Tests]], [[Test_-_Walkthrough|Walkthrough Test]], [[Test_-_Structured_Walkthrough|Structured Walkthrough Test]].
<br>
+
 
'''Note (1):''' Members of the recovery team meet in a conference room setting to discuss their responsibilities and how they would react to [[emergency]] scenarios by stepping through the plan.  
+
'''Note (1):''' Members of the recovery team meet in a conference room setting to discuss their responsibilities and how they would react to [[Emergency|emergency]] scenarios by stepping through the plan.
<br>
+
 
'''Note (2):''' Sometime referred to as a structured [[Test - Walkthrough| walkthrough]] test.
+
'''Note (2):''' Sometime referred to as a structured [[Test_-_Walkthrough|walkthrough]] test.
<br>
+
 
[[Image:3D BCM Series Testing and Exercising in the context of BCM Books.jpg|thumb|left|140px|Testing and Exercising Your Business Continuity Plan [http://store.bcm-institute.org/books/bcm-specialist-series BUY!]]]
+
{{Template:DR Course}}
<br>
+
{{BcmBoK 6 CL 2B}}<br/> <br/> {{BcmBoK 6 CL 2C}}<br/> <br/> {{BcmBoK 6 CL 2CC}}<br/> <br/> {{BcmBoK 6 CL 2D}}  
{{BcmBoK 6 CL 2B}}
+
{{Template:BLCoursesBanner}}
<br><br>
 
{{BcmBoK 6 CL 2C}}
 
<br><br>
 
{{BcmBoK 6 CL 2CC}}
 
<br><br>
 
{{BcmBoK 6 CL 2D}}
 
[[Image:2D A Managers Guide to ISO 22301 BCMS Dr Goh Moh Heng Web.jpg|thumb|left|140px|'''A Manager’s Guide to ISO 22301 Standard for Business Continuity Management System'''' (2014) [http://store.bcm-institute.org/books/bcm-manager-s-guide-specialist-series BUY!]]]
 
<br><br><br><br><br><br><br>
 
'''''Courses: BCM Certification'''''
 
* Attend: [http://www.bcm-institute.org/courses/iso-22301-business-continuity-management-systems-bcms-planner BCM-230: ISO22301 BCMS Planner] leading to [http://www.bcm-institute.org/certification/business-continuity-certified-planner-bccp BCCP]
 
* Attend: [http://www.bcm-institute.org/courses/iso-22301-business-continuity-management-systems-bcms-implementer BCM-300: ISO22301 BCMS Implementer] leading to [http://www.bcm-institute.org/certification/business-continuity-certified-specialist-bccs BCCS]
 
* Attend: [http://www.bcm-institute.org/courses/iso-22301-business-continuity-management-systems-bcms-manager BCM-400: ISO22301 BCMS Manager] leading to [http://www.bcm-institute.org/certification/business-continuity-certified-expert-bcce BCCE]
 
* Attend: [http://www.bcm-institute.org/courses/iso-22301-business-continuity-management-systems-bcms-expert-implementer BCM-5000: ISO22301 BCMS Expert Implementer] leading to [http://www.bcm-institute.org/certification/business-continuity-certified-expert-bcce BCCE]
 
 
{{Bcm Institute Source}}
 
{{Bcm Institute Source}}
 
|}
 
|}
[[Category:BCM Institute Glossary]]
 
[[Category:BCM Institute Crisis Management Glossary]]
 
[[Category:BCM Institute Crisis Communication Glossary]]
 
[[Category:BCM Institute DR Glossary]]
 
 
[[Category:BcmBoK 6 CL 2B]]
 
[[Category:BcmBoK 6 CL 2C]]
 
[[Category:BcmBoK 6 CL 2CC]]
 
[[Category:BcmBoK 6 CL 2D]]
 
 
'''2.''' A test method that presents a limited simulation of a [[crisis]] scenario in a narrative format in which participants review and discuss, not perform, the policy, methods, [[Procedure|procedures]], coordination, and resource assignments associated with plan activation.
 
  
 +
'''2.''' A test method that presents a limited simulation of a [[Crisis|crisis]] scenario in a narrative format in which participants review and discuss, not perform, the policy, methods, [[Procedure|procedures]], coordination, and resource assignments associated with plan activation.
 +
{{Template: BookMGITDRPlan}}
 
{{Asis Source}}
 
{{Asis Source}}
  
 +
'''3.''' One method of exercising teams in which participants review and discuss the actions they would take per their plans, but do not perform any of these actions. The [[Exercise|exercise]] can be conducted with a single team, or multiple teams, typically under the guidance of [[Exercise|exercise]] facilitators.
  
'''3.''' One method of exercising teams in which participants review and discuss the actions they would take per their plans, but do not perform any of these actions. The [[exercise]] can be conducted with a single team, or multiple teams, typically under the guidance of [[exercise]] facilitators.
+
(Source: Disaster Recovery Institute International / Disaster Recovery Journal - DRII/DRJ)
  
(Source: Disaster Recovery Institute International / Disaster Recovery Journal - DRII/DRJ)
+
[[Category:BCM Institute Glossary]] [[Category:BCM Institute Crisis Management Glossary]] [[Category:BCM Institute Crisis Communication Glossary]] [[Category:BCM Institute DR Glossary]] [[Category:BcmBoK 6 CL 2B]] [[Category:BcmBoK 6 CL 2C]] [[Category:BcmBoK 6 CL 2CC]] [[Category:BcmBoK 6 CL 2D]]

Latest revision as of 05:53, 30 October 2020

1. Tabletop Test is a test of the recovery plan in which actions are not actually performed.

Related Terms: Type of BC Tests, Type of DR Plan Tests, Walkthrough Test, Structured Walkthrough Test.

Note (1): Members of the recovery team meet in a conference room setting to discuss their responsibilities and how they would react to emergency scenarios by stepping through the plan.

Note (2): Sometime referred to as a structured walkthrough test.

BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2B: Intermediate (BC)


BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2C: Intermediate (CM)


BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2CC: Intermediate (CC)


BCMBoK Competency Level (CL)
BCMBoK 6: Testing and Exercising CL 2D: Intermediate (DR)

(Source: Business Continuity Management Institute - BCM Institute)

2. A test method that presents a limited simulation of a crisis scenario in a narrative format in which participants review and discuss, not perform, the policy, methods, procedures, coordination, and resource assignments associated with plan activation.

(Source: ASIS International - ASIS International)

3. One method of exercising teams in which participants review and discuss the actions they would take per their plans, but do not perform any of these actions. The exercise can be conducted with a single team, or multiple teams, typically under the guidance of exercise facilitators.

(Source: Disaster Recovery Institute International / Disaster Recovery Journal - DRII/DRJ)