Difference between revisions of "BCP Location of Command Centre / Offsite Office v2"

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Jump to navigation Jump to search
 
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
{{Button Back BCM TOC}}{{Button Back BCM PD}}
 +
= <span style="color:#0000FF">'''Location of Command Centre / Offsite Office''' =
 +
 
[[File:Plan Develop Template Part A 2.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]]
 
[[File:Plan Develop Template Part A 2.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]]
 +
This section document describes the location of the [[command Centre|command center]] and the [[Alternate Site|alternate site]].  It includes:
 +
* Location map
 +
* Telephone and fax numbers
 +
* Floor plan (optional)
  
* This section document describes the location of the [[command Centre|command center]] and the [[Alternate Site|alternate site]].  It includes:
+
{{Template:Planning Methodology PD}}
** Location map
 
** Telephone and fax numbers
 
** Floor plan (optional)
 
 
 
 
 
[[PD_Table_of_Content_v2| '''Back >> Table of Content''']]
 

Latest revision as of 05:40, 27 January 2020

CTA BacktoTableofContent All.jpg
BackBCM PD.png

Location of Command Centre / Offsite Office

Plan Develop Template Part A Copyright @ GMH Pte Ltd

This section document describes the location of the command center and the alternate site. It includes:

  • Location map
  • Telephone and fax numbers
  • Floor plan (optional)
BCM Planning Methodology PD.jpg