Pages without language links
Jump to navigation
Jump to search
The following pages do not link to other language versions.
Showing below up to 50 results in range #1,401 to #1,450.
- Logic Switch
- Logical I/O
- Logistics
- Logistics Management
- Loss
- Loss Adjuster
- Loss Reduction
- Lost Transaction Recovery
- Lt. Col. Asmuni
- Lt Col Husin Jazri
- MANAGE
- MERS-CoV
- MS1970 Glossary
- MTE Standard Operating Procedures for Chapter Chairperson of BCM Institute Forum
- Mail Services and Office Supplies
- Main Page
- Maintenance of Mechanical & Electrical (M&E) Services
- Major Application
- Major Incident
- Major Jerry Teoh
- Malevolence
- Malicious Software
- Malware
- Man-made Threat
- Management
- Management Commitment
- Management Review
- Management System
- Managing Common Area for Safety Violation
- Manson Garrick
- Manual Failover
- Manual Procedures
- Manufacturer
- Manufacturing
- Mapping
- Mapping Interconnections and Interdependencies
- Marcus Tan Tuan Soon
- Marginal Cost
- Marshalling Area
- Material Requirement Planning
- Materiality
- Matthew Bok
- Maturity Assessment
- Maturity Level
- Maturity Level/Milestone
- Maximum Acceptable Outage(MAO)
- Maximum Acceptable Outage (MAO)
- Maximum Acceptable Outage Time (MAOT)
- Maximum Allowable Downtime (MAD)
- Maximum Tolerable Downtime (MTD)