Scenarios and assumptions

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Revision as of 23:21, 26 May 2010 by Moh heng (talk | contribs) (→‎SCENARIOS AND ASSUMPTIONS)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Plan Develop Template Part A Copyright @ GMH Pte Ltd

Back >> Table of Content

SCENARIOS AND ASSUMPTIONS

  • Business disruptions to ABC Organization’s Critical Business Functions can arise from the following scenarios:
    • Utilities outage (including power).
    • Damage or denial of access to the Office Building (including fire and building collapse).
  • BC Planning in ABC Organization is based on the following key assumptions:
    • The main office (Name of Building) building is down, and the offsite data center/ office at Building Name, ABC Road is available.
    • Staff is denied access to the (Name of Building) building for a sustained period of X calendar days. Refer to Key Disaster Scenario
    • Only critical business functions will be accorded priority for restoration.
    • Should the crisis be projected to exceed seven (7) days, extended planning will commence after day 2 or 3.


Back >> Table of Content