BCP Detailed procedures v2

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Revision as of 22:23, 17 January 2020 by Moh heng (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Part B: Detailed Business Continuity Plan Procedures

Plan Development Template: Detail Procedures Page 1 Copyright @ GMH Pte Ltd
Plan Development Template: Detail Procedures Page 2 Copyright @ GMH Pte Ltd

Part B of this plan sets out the sequential procedures to be undertaken upon activation for the entire organization.

Time Period for 6 "Rs"

Part B is divided into the following time period of the business continuity life cycle. The time period where each “R” is implemented is as follows:

Plan Development Template: Detail Procedures Page 3 Copyright @ GMH Pte Ltd
Plan Development Template: Detail Procedures Page 4 Copyright @ GMH Pte Ltd
Plan Development Template: Detail Procedures Page 5 Copyright @ GMH Pte Ltd