Plan Development
1. Plan Development is a phase within the BCM planning process.
Notes (1): It is to determine the procedures for notifying the right people, assessing the operational impact. Notes (2): It is also to develop specific steps for minimizing the risks of an outage, and restoring normal operations after the outage. Notes (3): The output from this step is the BC Plan CM Plan, CC Plan or DR Plan. Related Terms: BCM Planning Process or Methodology, DR Planning Process or Methodology.
|