Business Continuity Life Cycle

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Revision as of 23:11, 23 January 2025 by Moh heng (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
1. This Business Continuity or BC life cycle consists of the 6 “Rs”. The time period where each “R” is implemented is as follows:
BL-B-5 Click to know more



Related Terms: Business Continuity Life Cycle, Disaster Recovery Life Cycle, Operational Resilience Lifecycle

The 6 ”R’s” sequence of the Disaster Recovery Life Cycle is different from the Business Continuity Life Cycle.

Note (1): BC Life Cycle: Reduce(R1), Response(R2), Resume(R3),Recover(R4), Restore(R5), Return(R6).

Note (2): DR Life Cycle: Reduce(R1), Response(R2), Recover(R3), Re-sync(R4), Resume(R5), Return(R6).


BCM Institute's Professional Training and Certification
BCMBoK Competency Level
BCMBoK 5: Plan Development CL 1B: Foundation (BC)



BCMBoK Competency Level
BCMBoK 5: Plan Development CL 1C: Foundation (CM)



BCMBoK Competency Level
BCMBoK 5: Plan Development CL 1CC: Foundation (CC)



BCMBoK Competency Level
BCMBoK 5: Plan Development CL 1D: Foundation (DR)
Click to know more about expert level training

(Source: Business Continuity Management Institute - BCM Institute)

2. The element of BCM is concerned with developing and implementing appropriate plans and arrangements to ensure continuity of critical activities and the management of an incident.

Implementing Your Business Continuity Plan BUY!

(Source: AE/HSC/NCEMA 7000:2021)