Business Continuity Testing Cycle
Jump to navigation
Jump to search
1. In a typical Business Continuity or BC Testing Cycle, these are the different level of Testing or type of tests to be conducted and the whole testing process is usually, circular and cyclical spanning over aa period and determined by a test schedule. The testing cycle is to ensure that each type of tests become more complex over time.
Note: It is important to note that the tests for business continuity are different from a disaster recovery test. Related Terms: Test Schedule,Type of BC Tests,
|