Integrated Test
Jump to navigation
Jump to search
1. An Integrated Test involves integrating any number of components in the order that they would occur during actual recovery operations.
Integrated test builds on test successes and increasing employee awareness generated during component testing. Related Terms: Type of BC Tests.
|
2. A test conducted on multiple components of a plan, in conjunction with each other, typically under simulated operating conditions.
(Source: Disaster Recovery Institute International / Disaster Recovery Journal - DRII/DRJ)