Integrated Test
Jump to navigation
Jump to search
1. An Integrated Test involves integrating any number of components in the order that they would occur during actual recovery operations.
![]() Integrated test builds on test successes and increasing employee awareness generated during component testing. Related Terms: Type of BC Tests. ![]()
![]()
|
2. A test conducted on multiple components of a plan, in conjunction with each other, typically under simulated operating conditions.

(Source: Disaster Recovery Institute International / Disaster Recovery Journal - DRII/DRJ)