Difference between revisions of "BCP Scenarios and assumptions v2"

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Jump to navigation Jump to search
Line 1: Line 1:
{{Template:Planning Methodology PD}} {{Button Back BCM PD}}  
+
{{Template:Planning Methodology PD}} {{Button Back BCM PD}} {{Button Back BCM TOC}}
 
= <span style="color:#0000FF">'''Scenarios and Assumptions''' =
 
= <span style="color:#0000FF">'''Scenarios and Assumptions''' =
{{BCM Series Plan Development}}
+
 
{{Button Back BCM TOC}}
 
 
[[File:Plan Develop Template Part A 1.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]]
 
[[File:Plan Develop Template Part A 1.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]]
 
[[PD_Table_of_Content_v2| '''Back >> Table of Content''']]
 
[[PD_Table_of_Content_v2| '''Back >> Table of Content''']]
Line 16: Line 15:
 
* Only critical business functions will be accorded priority for [[restore| restoration]].
 
* Only critical business functions will be accorded priority for [[restore| restoration]].
 
* Should the [[crisis]] be projected to exceed seven (7) days, extended planning will commence after day 2 or 3.
 
* Should the [[crisis]] be projected to exceed seven (7) days, extended planning will commence after day 2 or 3.
 
  
 
{{Button Back BCM TOC}}
 
{{Button Back BCM TOC}}

Revision as of 05:34, 27 January 2020

BCM Planning Methodology PD.jpg
BackBCM PD.png
CTA BacktoTableofContent All.jpg

Scenarios and Assumptions

Plan Develop Template Part A Copyright @ GMH Pte Ltd

Back >> Table of Content

Business disruptions to Organization’s Critical Business Functions can arise from the following scenarios:

  • Utility outage (including power).
  • Damage or denial of access to the Office Building (including fire and building collapse).

Key Assumptions

BC Planning in ABC Organization is based on the following key assumptions:

  • The main office (Name of Building) building is down, and the offsite data center/ office at Building Name, ABC Road is available.
  • Staff is denied access to the (Name of Building) building for a sustained period of X calendar days. Refer to Key Disaster Scenario
  • Only critical business functions will be accorded priority for restoration.
  • Should the crisis be projected to exceed seven (7) days, extended planning will commence after day 2 or 3.