Difference between revisions of "BCP Scenarios and assumptions v2"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | {{Template:Planning Methodology PD}} {{Button Back BCM PD}} | + | {{Template:Planning Methodology PD}} {{Button Back BCM PD}} {{Button Back BCM TOC}} |
= <span style="color:#0000FF">'''Scenarios and Assumptions''' = | = <span style="color:#0000FF">'''Scenarios and Assumptions''' = | ||
− | + | ||
− | |||
[[File:Plan Develop Template Part A 1.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]] | [[File:Plan Develop Template Part A 1.jpg |300px|thumb|right|Plan Develop Template Part A '''Copyright @ [http://www.gmhasia.com GMH Pte Ltd'''] ]] | ||
[[PD_Table_of_Content_v2| '''Back >> Table of Content''']] | [[PD_Table_of_Content_v2| '''Back >> Table of Content''']] | ||
Line 16: | Line 15: | ||
* Only critical business functions will be accorded priority for [[restore| restoration]]. | * Only critical business functions will be accorded priority for [[restore| restoration]]. | ||
* Should the [[crisis]] be projected to exceed seven (7) days, extended planning will commence after day 2 or 3. | * Should the [[crisis]] be projected to exceed seven (7) days, extended planning will commence after day 2 or 3. | ||
− | |||
{{Button Back BCM TOC}} | {{Button Back BCM TOC}} |
Revision as of 05:34, 27 January 2020
Scenarios and Assumptions
Business disruptions to Organization’s Critical Business Functions can arise from the following scenarios:
- Utility outage (including power).
- Damage or denial of access to the Office Building (including fire and building collapse).
Key Assumptions
BC Planning in ABC Organization is based on the following key assumptions:
- The main office (Name of Building) building is down, and the offsite data center/ office at Building Name, ABC Road is available.
- Staff is denied access to the (Name of Building) building for a sustained period of X calendar days. Refer to Key Disaster Scenario
- Only critical business functions will be accorded priority for restoration.
- Should the crisis be projected to exceed seven (7) days, extended planning will commence after day 2 or 3.