Part 2: RAR - Treatment and Control v2

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Revision as of 03:18, 9 January 2020 by Hua Wei (talk | contribs)
Jump to navigation Jump to search

After identifying the list of threats faced by the organisation in the previous section, participants will then proceed to the Treatment and Control section

Completion of Business Unit (BU) BCM Coordinator

List of Threats
  • Threat
    • The Name of each threat identified in List of Threats. BCM Coordinators are to ensure that all threats that have been highlighted in the previous section are represented here under the threat column.

Existing Risk Treatment

  • Existing Controls
    • Controls are instruments or practices that are used to manage risk. All controls fall within one of the above 4 treatment options and served as an elaboration of the existing risk treatments.
    • Existing Controls are "Controls" that are already implemented within your organization to managed the identified risk.
  • Additional Controls
    • Additional Controls are Controls that will be identified within the questionaire