There is currently no text in this page. You can search for this page title in other pages, or search the related logs, but you do not have permission to create this page.
Category:BCM Institute DR Glossary
Jump to navigation
Jump to search
Pages in category "BCM Institute DR Glossary"
The following 193 pages are in this category, out of 393 total.
(previous page) (next page)M
- Major Application
- Man-made Threat
- Manual Failover
- Mapping
- Mapping Interconnections and Interdependencies
- Maturity Assessment
- Maturity Level
- Maximum Acceptable Outage (MAO)
- Maximum Acceptable Outage Time (MAOT)
- Maximum Allowable Downtime (MAD)
- Maximum Tolerable Downtime (MTD)
- Maximum Tolerable Level of Disruption
- Maximum Tolerable Period of Disruption (MTPOD)
- Milestone
- Minimum Business Continuity Objective
- Minimum Business Continuity Objective (MBCO)
- Mirror Backup
- Mirroring
- Mobile Recovery Site
- Mobile Site
- Mobilization
- Mutual Aid Agreement
O
- Objective
- Occupant Emergency Planning (OEP)
- Offsite Backups
- Offsite Storage
- Online backup
- Online Backup
- Operational Disruptions
- Operational Resilience
- Operational Resilience Culture
- Operational Resilience Lifecycle
- Operational Resilience Maturity
- Operational Resilience Policy
- Operational Resilience Principles
- Operational Resilience Strategy
- Operational Resilience Vision
- Operational Risk
- Operational Risk Management
- OR Body of Knowledge (ORBoK)
- OR BoK 1: Plan
- OR BoK 2: Implement
- OR BoK 3: Sustain
- OR BoK P1: Plan
- OR Competency Level (CL)
- Organization
- Organization BCM Coordinator
- Organization DR Coordinator
- Organizational Culture
- Organizational Resilience
P
- Partial Simulation Test
- People
- Performance
- Period of Disruption
- Plan Development
- Planning Software
- Plausible Scenarios
- Policy
- Prevent
- Primary Site
- Principles for Operational Resilience
- Procedure
- Process
- Program
- Program Management
- Project
- Project Management
- Project Sponsor
- Project Team
- Prudential Regulatory Authority (PRA)
- Publics
R
- Re-sync
- Readiness Checklist
- Reciprocal Agreement
- Reciprocal Site
- Record Keeping
- Recover
- Recovery Objectives - Category
- Recovery Period
- Recovery Point Objective (RPO)
- Recovery Team
- Recovery Team Leader
- Recovery Time Objective (RTO)
- Recovery Work Area
- Reduce
- Redundant Arrays of Independent Disks (RAID)
- Template:References Disaster Recovery
- Relational Resilience
- Remote Failover
- Remote Journaling
- Remote Mirroring
- Remote Tape Vaulting
- Replication
- Request for Proposal
- Residual Risk
- Resilience
- Resilient Information Communication Technology (ICT)
- Respond
- Response
- Responsible
- Restoration Team
- Restore
- Resume
- Return
- Risk
- Risk Acceptance
- Risk Analysis
- Risk Analysis and Review
- Risk Appetite
- Risk Assessment
- Risk Avoidance
- Risk Evaluation
- Risk Impact
- Risk Level
- Risk Likelihood
- Risk Mitigation
- Risk Rating
- Risk Reduction
- Risk Tolerance
- Risk Transference
- Risk Treatment
S
- Salvage Team
- Scenario Description
- Scenario Library
- Scenario Testing
- Service Level Agreement
- Service Recovery Time Objective
- Severe but Plausible Scenarios
- Simulation
- Stakeholder
- Standby
- Storage Area Network
- Strategy Roadmap
- Supply Chain Resilience
- Synchronous
- Synchronous Replication
- System
- System Development Life Cycle
- System Recovery Time Objective
T
- Target Audience
- Target Group
- Task
- Team Mobilization
- Technology Resilience
- Test
- Test - Checklist
- Test - Cutover
- Test - Disaster Recovery Plan Test Cycle
- Test - Full Interruption
- Test - Paper
- Test - Parallel
- Test - Structured Walkthrough
- Test - Tabletop
- Test - Walkthrough
- Test Schedule
- Testing
- Testing and Exercising
- Third Party Resilience
- Third Party Risk Management
- Third-party Dependency Management
- Threat
- Three-Phase Approach of Capability and Maturity Assessment
- Tolerance for Disruption
- Training
- Type of Disruption
- Type of Plans
- Type of Tests
- Types of Crisis